Sample Reports

What Our Analysis Looks Like

Examples of the type of documentation and detail you can expect from our independent construction budget reviews.

Executive summary page of technical report with key findings highlighted, charts showing cost comparisons and professional formatting on white paper
Report executive summary

Report Structure

Our reports follow a consistent structure designed to present findings clearly and comprehensively. Each report includes:

  • Executive summary of key findings
  • Methodology and sources explanation
  • Category-by-category detailed analysis
  • Market comparison data
  • Risk areas and concerns
  • Supporting documentation

Example Report Summaries

These examples illustrate the type of analysis provided, though specific findings vary by project

Residential Development Budget Analysis

12 Units Santiago New Construction

Project Overview

Twelve-unit residential development in Santiago. Investment group requested review of developer-provided budget before committing funds. Total budgeted cost approximately 840 million CLP.

Key Findings

  • Structural Costs: Concrete and rebar costs aligned with current market rates. Formwork costs appeared reasonable.
  • Finishing Materials: Kitchen and bathroom fixture allowances were below typical market prices for specified quality level. Flooring costs appeared optimistic by approximately 15-20%.
  • Labor Rates: Most labor rates aligned with current market standards. Electrical installation rates were slightly below typical contractor pricing.
  • Missing Items: Budget did not include landscaping, exterior lighting, or mailbox installation. Temporary utilities during construction were not itemized.
  • Contingency: Five percent contingency appeared low for project of this complexity and timeline. Industry standard typically ranges from 8-12%.

Commercial Space Renovation Review

450 sqm Valparaíso Renovation

Project Overview

Renovation of existing commercial space in Valparaíso for conversion to mixed retail and office use. Cooperative group requested budget verification before proceeding. Total budgeted cost approximately 185 million CLP.

Key Findings

  • Demolition Work: Quantities for demolition and debris removal appeared understated. Budget assumed single dumpster rental when project likely requires multiple loads.
  • Structural Modifications: Steel beam costs aligned with current supplier pricing. Engineering fees for structural calculations were not included in budget.
  • HVAC System: HVAC equipment costs were consistent with market rates. Installation labor appeared optimistic given ceiling height and access constraints.
  • Electrical Upgrade: Service panel upgrade and wiring costs aligned with current electrical contractor rates. Permit fees for electrical work were not itemized.
  • Finishes: Paint, flooring, and ceiling finish costs appeared reasonable. Bathroom fixture allowances were adequate for specified commercial-grade products.

Mixed-Use Development Cost Analysis

8 Residential + 3 Commercial Viña del Mar New Construction

Project Overview

Mixed-use building with ground floor commercial spaces and residential units above. Crowdlending platform participants requested independent budget review. Total budgeted cost approximately 1.2 billion CLP.

Key Findings

  • Foundation Work: Excavation quantities appeared reasonable based on soil reports. Concrete costs aligned with current ready-mix pricing including delivery.
  • Structural System: Reinforced concrete frame costs were consistent with market rates. Structural steel for commercial spans appeared slightly understated.
  • Building Envelope: Window and door costs aligned with specified product lines. Exterior cladding material costs were reasonable. Installation labor rates appeared optimistic.
  • Mechanical Systems: Commercial HVAC equipment costs were appropriate. Residential unit ventilation system was not clearly itemized in budget.
  • Fire Protection: Sprinkler system costs aligned with current contractor pricing. Fire alarm system appeared adequate for building size and occupancy.
  • Site Work: Parking area paving costs were reasonable. Stormwater management system was not included in budget despite being required by local regulations.

What Makes Our Reports Useful

Line-by-Line Detail

Every budget item is addressed individually with specific observations about cost accuracy and market alignment.

Market Comparisons

Current Chilean construction market prices are provided for context, sourced from multiple industry references.

Clear Explanations

Technical findings are presented in straightforward language without jargon or unnecessary complexity.

Source Documentation

Our methodology and information sources are disclosed so you understand the basis for observations.

Risk Highlighting

Areas of concern are clearly identified and explained so you know where budget assumptions may be problematic.

Professional Format

Reports are organized logically, formatted professionally, and delivered as comprehensive PDF documents.

Important Note About Reports

These examples illustrate report structure and the type of analysis provided. Actual findings vary significantly by project. Each budget is unique and requires individual evaluation.

Our reports present technical cost analysis only. They do not include investment recommendations, project approval or rejection, or predictions about project success.

Request Your Budget Review